Tunnel Greenhouse Construction

  • Tunnel Greenhouse Construction
  • Tunnel Greenhouse Construction
  • Tunnel Greenhouse Construction
  • Tunnel Greenhouse Construction
  • Tunnel Greenhouse Construction
  • Tunnel Greenhouse Construction
Tunnel Greenhouse Construction
  • HengFeng
  • Qingzhou
  • 2-3 weeks
  • 50000

tunnel greenhouse ,
main use arch pipes,direct insert ground,very easy installation,invest small,and so pupular by so many country farmers

Tunnel Greenhouse Construction

3955-202404151547457607.jpg




this tunnel greenhouse construction :

  1. use main frame cold dip galvanzied steel pipes,invest small good use

  2. greenhouse outside cover with 150 micron po film

  3. shoulder high 1.7m



tunnel greenhouse construction:


  span    5m
    length   customzie
   shoulder high 1.7m
   roof high  3m
   ventilation  2 sides roller film ventilation system
    main frame cold dip galvanzied steel pipes






tunnel greenhouse construction:




tunnel greenhouse construction:

main pillars cold dip galvanzied steel pipes ,long service use life ,span 5-16m,shoulder high 1.7m,roof high 3m,2 side set ventilation part outside set with insect proof mesh,insert ground 30cm, stable and easy opertion it.


 This kind greenhouse had export too many countries,in southeas area,in Bhutan,in USA,in Russia etc countries all have our greenhouse.




how to installation this small tunnel greenhouse?

when in work site installation,will show CAD every parts installation pictures,some videos ,anyway this kind greenhouse very easy insallation .





anytime welcome all of you visit our company~

check goods quality and check now input use case

3955-202403271047322109.jpg



Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right